Guides

What is a run of show?

A run of show is the item-by-item plan a crew works from on event day. It says what happens, when, where, for how long, and who makes it happen.

What a run of show is

A run of show (ROS) lists every moment of an event in order, from the first truck at the dock to the last case out the door, or at least from doors to the final goodnight. Each line has a time, a length, a place and an owner. Most also carry what each technical department does at that moment.

It is a crew document. Guests never see it. The producer builds it, the show caller or stage manager runs the night from it, audio, video and lighting take their cues from it, and the caterer times the kitchen against it.

You will hear it called other things. Corporate production in the US mostly says run of show or show flow. Sports and broadcast say rundown. UK, Irish and Australian teams tend to say run sheet or running order. People use these loosely, and in most rooms they mean the same document.

What it is not

Small events fold several of these into one sheet. Larger ones keep them separate. The full comparison is in run of show, cue sheet and production schedule.

Who uses it, and how

One document serves people who want very different things from it.

That spread is why one spreadsheet starts to strain. Either everyone gets everything, including details that are not theirs to see, or someone spends the night before making trimmed copies.

Anatomy of a row

Formats differ from shop to shop. A working run of show nearly always carries these:

Some teams carry two clocks: the time of day and the elapsed time since the show started. Elapsed time makes it obvious how far ahead or behind you are, whatever the wall clock says.

A short example

Here is the middle of a gala evening. The run of show template has the full night, load-in to load-out.

#StartLengthItemOwnerNotes
66:15 PM15 minWelcome remarksStage managerLectern mic. House lights to half.
76:30 PM45 minDinner serviceCatering captainDinner music. No program during the main course.
87:15 PM35 minKeynoteStage managerHandheld plus backup. Slides on both screens.
8.17:50 PM3 minSponsor videoVideo leadAdded Tuesday. If it fails, go straight to awards.
97:53 PM30 minAwards presentationStage managerWalk-up music per award. Photographer stage right.

How it gets built

It usually starts with the producer, technical director or show caller, working from what the client wants the night to be and whatever scripts exist. Then each department adds its own detail: mic labels, lighting looks, which screen shows what.

A common order of work:

  1. Fix the points that cannot move. Doors, the venue's hard out, the time the kitchen needs to fire, a broadcast or livestream start.
  2. Work backwards and forwards from those. Fit load-in, sound check and rehearsal in front of doors. Fit the program between dinner and the hard out.
  3. Give every item a duration. A start time alone tells you nothing about what moves when something runs long.
  4. Let departments add their columns.
  5. Rehearse against it, then correct it. Rehearsal is where you find out the walk from the green room takes ninety seconds, not ten.
  6. Lock it. Advice on when varies. Some teams freeze the running order a few days out, others about 48 hours before. Whatever you choose, tell everyone what "locked" means and who can still change it.

In practice, changes keep arriving until someone walks on stage. The goal of locking is to make sure changes pass through one person, so that everyone hears about them.

What happens on show day

On the night, the show caller reads down the document and cues the crew. The usual pattern is a standby, which warns an operator that their cue is next, and a go, which is the only word that makes anything happen. Many callers stop using the word "go" in ordinary conversation on headsets for exactly that reason.

Two things decide how well a show recovers when it runs long.

Knowing which times are hard. Doors, a curfew, a room that has to be flipped for the next group, a live broadcast hit. These do not move. Everything else is soft and can slide. Mark the difference in the document so nobody has to work it out under pressure.

Knowing what you would cut. If the keynote runs twelve minutes over, every later row is now wrong. Something has to absorb those twelve minutes: a shorter break, a trimmed video, an award moved to the printed program. Decide the order of cuts before the show, with the client, while everyone is calm.

Timing-sensitive technical cues are often tied to a spoken line or an action on stage, not to the clock. "Lights up when she says good evening" still works when the show is nine minutes late. "Lights up at 7:15" does not.

Multi-room and multi-day shows

A conference with a main stage and four breakouts is really five shows that share a venue and a lunch. Most teams keep one run of show per room or stage, with a master view that shows where they line up: shared breaks, the moment everyone moves to the general session, the crew that has to be in two places.

The same goes for days. Each day gets its own run of show, and the production schedule ties them together. The detail that catches people is the overnight: which rooms flip, when, and who is still on site to do it.

Where spreadsheets break

Most runs of show live in a spreadsheet, and most producers can name the night it let them down. The recurring problems:

If you stay in a spreadsheet, a few habits help. One person owns the master. Nobody edits a copy. Every version carries a number and a time at the top of page one. And when something changes, say what changed, not only that there is a new file.

How myROS handles it

myROS is run of show software for event producers. Every cue has a start and a length, so when one runs long the cues after it move with it. The same show reads as a timeline or as a cue sheet, across multiple days and rooms. Each team then gets a day-of packet with only the parts that are theirs.

Common questions

What does ROS stand for?

Run of show. It is the crew-facing, item-by-item plan for a live event.

Who creates the run of show?

Usually the producer, technical director or show caller writes the first draft, and each department lead then adds their own detail. One person should own the master copy.

How detailed should a run of show be?

Detailed enough that someone who was not in the planning meetings could run the night from it. For a small dinner that may be fifteen rows. For a general session with video and awards it may be several pages.

What is the difference between a run of show and an agenda?

The agenda is what guests see: times and titles. The run of show is what the crew sees: the same moments with owners, rooms, technical notes and everything that happens before doors and after the last guest leaves.

Is a run of show the same as a cue sheet?

People use the terms differently. Many treat them as the same thing. Others use cue sheet for the narrower, more technical list of lighting, audio and video actions inside the program.

When should the run of show be locked?

There is no standard. Many teams freeze the running order somewhere between a few days and 48 hours out, then route any later change through one person.

Who should get a copy?

Everyone working the event should get the part that concerns them. Crew usually get the whole thing. Vendors and talent are better served by a shorter version with their own times and contacts.

myROS is opening soon.Run of show software for event producers.
Join the waitlist